Home/Blog/TNEB fixed & demand charges 2026

TNEB fixed and demand charges 2026: what you pay before the first unit, and how to cut it

The part of a business bill that does not depend on units: the rates, one worked example, and the levers that lower it.

Tariffs4 min readBy Goggles Energy engineering teamUpdated

Every business bill has two parts. The energy charge pays for the units you used. The fixed charge (LT) or demand charge (HT) pays for capacity kept ready for you, whether you use it or not. Most owners watch the units; the fixed part is often where easy savings sit. Homes (LT-IA) pay no fixed charge, so this page is about shops, offices and factories.

Fig 01 · One month, HT factory

80% energy20%
Energy ₹7,50,000 (1,00,000 units × ₹7.50). Solar can cut this.Demand ₹1,82,400 (300 kVA × ₹608). Solar can’t.
About a fifth of this bill is fixed. It stays the same whether the roof makes power or not.

TNEB fixed and demand charges by connection (2026)

Monthly fixed and demand charges, TNERC Tariff Order No. 6 of 2025 (unchanged in 2026)
ConnectionCharge a monthBilled on
LT-V shops, offices₹110 a kW up to 50 kW · ₹332 to 112 kW · ₹608 above*Sanctioned load
LT-IIIB small factories₹84 a kW up to 50 kW · ₹165 to 112 kW · ₹608 above*Sanctioned load
LT-IIIA(1) cottage units up to 12 kW₹77 a kWConnected load
HT-I industry and IT services₹608 per kVAThe higher of recorded maximum demand or 90% of contract demand
HT-III malls, hotels, private hospitals₹608 per kVASame rule as HT-I

*Fixed charges are billed per kW (or part) of contracted demand. The tariff order does not spell out whether a higher band rate applies to the whole load or only to the kW inside that band, so check your bill if you are above 50 kW.

How to reduce fixed charges: right-size your contract demand

If your contract demand is higher than you need, you pay for the gap every month.

Fig 02 · Same factory, two contract demands

Contract 500 kVAbilled 450 kVA = ₹2,73,600
Contract 420 kVAbilled 380 kVA = ₹2,31,040
Contract demandHighest demand actually recorded (380 kVA)Billing floor: 90% of contract
₹42,560 a month saved, about ₹5.1 lakh a year, from one application to TNPDCL. Production does not change; only the contract demand does. Leave headroom for growth before you cut.

Three more ways to cut the rest of your bill

  • Keep power factor up. HT must stay at 0.90 or above: each 0.01 below costs 1% of consumption charges down to 0.85, 1.5% down to 0.75 and 2% below that. Three-phase LT-IIIB and LT-V must stay at 0.85: 1% per 0.01 down to 0.75, then 1.5%. There is no bonus for a high power factor. Rooftop solar lowers the power factor your meter sees, so retune the capacitor (APFC) panel after commissioning.
  • Don’t run big loads together. Maximum demand is averaged over each demand interval, so what counts is how many compressors or furnaces run at the same time, not the starting surge.
  • Avoid peak hours. The energy charge is 25% higher 6–10 am and 6–10 pm on most HT connections and on LT-IIB, LT-IIIB and LT-V (for FY 2026-27, LT-IIIB pays 15% with a smart meter and nothing without one).

What solar can’t cut

Solar cuts the energy charge. It doesn’t remove the fixed or demand charge, because you still need the grid at night and on cloudy days. That is why our calculator counts only the energy saving. Batteries can lower an HT demand charge only if they shave the peak every day and you also lower the contract demand, because billing never drops below 90% of it (when storage pays). All business rates: TNEB commercial tariff per unit. Home bills: why your EB bill is high.

Get your bill checked, free

Leave your number. An engineer calls or WhatsApps you with the right size, price and savings, usually the same working day.

We’ll reply on WhatsApp or call you about this enquiry.

Send your EB bill photo on WhatsApp

Thanks, we have your number.

We’ll call or WhatsApp you within 1 working hour (Mon–Sat, 9 am – 6 pm). Free site visit, no obligation.

Don’t know your sanctioned load or contract demand? WhatsApp us your EB bill; we will read it for you.

Frequently asked questions

What are fixed charges in a TNEB bill?

A monthly charge for the capacity kept ready for your connection, billed per kW of load whatever units you use. LT-V shops pay ₹110 a kW a month up to 50 kW; LT-IIIB factories pay ₹84.

What is the maximum demand charge in TNEB?

₹608 per kVA a month on HT connections, billed on the higher of your recorded maximum demand or 90% of your contract demand (TNERC Tariff Order No. 6 of 2025).

How can I reduce fixed charges in my electricity bill?

Match your sanctioned load or contract demand to what you really use (check 12 months of bills first, then apply to TNPDCL), avoid running big loads at the same time on HT, and keep power factor above the minimum to avoid penalties.

What is the power factor penalty in TNEB?

HT must stay at 0.90 or above: 1% of consumption charges per 0.01 below, down to 0.85; 1.5% per 0.01 down to 0.75; 2% below that. Three-phase LT-IIIB and LT-V must stay at 0.85: 1% per 0.01 down to 0.75, then 1.5%. There is no incentive for a higher power factor.

Does rooftop solar reduce fixed charges?

No. Solar cuts the energy charge for units you use on site. Fixed and demand charges stay because you still need the grid connection. Batteries lower an HT demand charge only if they shave the peak every day and you also lower the contract demand.

Sources: TNERC Tariff Order No. 6 of 2025 (in force from 1 July 2025; no new tariff in 2026), TNERC Order No. 4 of 2026 (state support), TNERC GISS Regulations 2021. Checked 16 Nov 2026.

Send us your bill. We will check load, demand and power factor, free.

Get a free bill check

Free site visit + free savings report

Send three details. An engineer reviews your bill and tells you the right system size, your subsidy and savings, free and with no obligation. We usually call or WhatsApp the same working day.

We’ll reply on WhatsApp or call you about this enquiry.

Prefer chat? or call +91 77081 08158. No spam, no call centre.

Thank you, we have your details.

We’ll call or WhatsApp you within 1 working hour (Mon–Sat, 9 am – 6 pm). Free site visit · subsidy paperwork done for you.

Reading is good. A feasibility assessment is better.

Get a solar feasibility assessment
Free quote