What we design, build and integrate.

Architectural BIPV, the engineering disciplines behind every plant, and the five commercial models you can build under.

01BIPV · Architectural solar

BIPV installation at the IMI office building, Chennai, modules integrated into the building envelope

When the envelope becomes the power plant.

Building-integrated PV replaces conventional cladding and glazing with modules that generate, so architecture and energy stop competing for the same surface.

For architects, BIPV is a design decision as much as an energy one. We start at concept, colour, transparency, mullion coordination, structural glazing, so it reads as a façade, not panels bolted on.

Build-up

Glass-glass modules

Toughened glass-glass laminates with encapsulated cells, engineered for façade loads, fire and weather performance, and a 25-year generating life as a building surface.

IEC 61215 / 61730
Integration

Structural glazing

Modules coordinated with the curtain-wall grid: mullion spacing, spandrel and vision zones, concealed DC routing and junction access designed with the façade consultant.

Curtain-wall coordinated
Expression

Colour & transparency

Selectable cell colour, opacity and pattern let the façade read as glass, stone or a custom finish, while daylight transmission is tuned for the spaces behind it.

Vision · Spandrel · Frit
Bring BIPV into your project

02Engineering behind performance

The plant is won or lost before procurement.

Good economics come from getting the engineering right: sizing, structure, electricals, yield and commercials. Adding more panels fixes none of them. Eight disciplines sit behind every plant we build.

01

Feasibility & yield

Your bills, your roof, a bankable generation figure, before you commit a rupee.

Bill · Load · Site
02

Structural engineering

Roof capacity and wind load to IS 875, with a mount that respects your building’s warranty.

IS 875 · Wind load
03

Electrical & SLD design

SLDs, cable and protection sizing, earthing and lightning protection, built for uptime.

SLD · Protection · Earthing
04

Generation & shading

Simulation-grade yield with 3D shading, soiling and temperature losses. A realistic annual number.

PVsyst-class · Shading
05

Equipment selection

Tier-1 modules and inverters chosen for bankability and fit with your site, not price alone.

Tier-1 · Bankable
06

Financial modelling

CAPEX, loan, RESCO and open access compared side by side: payback, IRR and cost per unit.

IRR · Payback · LCOE
07

DISCOM & approvals

Net-metering, CEIG and open-access paperwork, handled end to end.

Net-metering · CEIG
08

Monitoring & analytics

String-level monitoring with alerts. A generation dip gets caught in days, not at the quarterly review.

Monitoring · PR tracking

03Commercial models

Choose how you own or procure solar power.

Buy the plant outright, finance it, let a developer own it, own it after a term, or draw power from an off-site plant. The hardware is the same, what changes is how you pay for it.

You invest once and own the plant from day one. Every unit it generates is yours, and so is the entire saving.

Upfront full cost · ownership day one · payback 3–5 yrs (indicative)

Full comparison table
Commercial models compared
ModelUpfrontOwnership Best forPaymentO&M
CAPEXOwn the asset UpfrontFull system cost, on your books OwnershipYours from day one Best forCapital-ready owners seeking maximum long-term return PaymentOne payment; the plant then runs at near-zero cost for 25+ years. Payback typically 3–5 yrs indicative O&MAnnual AMC with Goggles Energy
Loan / EMIOwn it, financed UpfrontMargin money upfront; the balance may be arranged through third-party lending partners, subject to eligibility and lender approval OwnershipYours from day one Best forOwners who want the asset without the upfront cheque PaymentFixed EMI over 3–5 yrs, typically covered by the solar saving indicative O&MAnnual AMC with Goggles Energy
RESCO / PPAZero capex Upfront₹0, developer finances & builds OwnershipDeveloper during the PPA Best forSavings without capital outlay or asset responsibility PaymentPer-unit solar tariff below your grid rate, 15–25 yr PPA O&MIncluded, developer carries performance risk
BOOTOwn after term Upfront₹0 during the PPA period OwnershipTransfers to you at term end Best forEventual ownership without investing now PaymentTariff below grid; asset transfers after 10–15 yrs O&MDeveloper during PPA; AMC after transfer
Open accessBeyond the roof UpfrontVaries, captive, group captive or third-party OwnershipDepends on the structure chosen Best forMulti-MVA sites scaling beyond rooftop capacity PaymentWheeling + open-access tariff, attractive for large consumers depending on state regulations, charges and load profile indicative O&MSplit or bundled; Goggles coordinates across assets

Not sure which model fits? Our feasibility assessment models CAPEX, RESCO and open access side by side against your actual bills and load, so you compare like with like. Read the full comparison.

Your plant deserves its own set of numbers.

Get a solar feasibility assessment