Success stories, by the numbers.

Solar projects across industrial, commercial, institutional and residential sectors: the site problem, the engineering, and the economics. Customer names are withheld where confidentiality matters.

Multiple sectors150+ MW installed since 2013South India execution

Case study stories

Unless marked Verified project, the capacity, generation, savings and payback figures below are indicative representative ranges for anonymised projects. Exact numbers for your site come from a feasibility assessment.

121 kWp rooftop solar array on GI sheet at a factory in Mahindra World City, Chennai
Verified project  IndustrialMahindra World City, Chennai · GI sheet

Export manufacturer offsets its daytime factory load

121kWp
Capacity
1,81,688kWh/yr
Generation
~165t/yr
CO₂ avoided

Modules REC · Inverter Fronius

Site

A 121 kWp rooftop on GI sheet at Mahindra World City, Chennai, sized to the plant's daytime process load.

Kit

REC modules on Fronius inverters, delivering about 1.82 lakh units a year.

Result

Roughly 165 tonnes of CO₂ avoided each year against the daytime grid draw.

Discuss a similar plant
5.1 kWp rooftop solar system on the RCC roof of a Padmanabhan IOCL fuel station in Kanyakumari
Verified project  CommercialVetturnimadam, Kanyakumari · RCC roof

Fuel station runs on rooftop solar

5.1kWp
Capacity
7,650kWh/yr
Generation
~6.96t/yr
CO₂ avoided

Modules REC · Inverter SMA

Site

A compact 5.1 kWp RCC-roof system for the Padmanabhan IOCL fuel station in Vetturnimadam, Kanyakumari.

Kit

REC modules on an SMA inverter, generating about 7,650 units a year.

Result

About 6.96 tonnes of CO₂ avoided each year at the forecourt.

Discuss a similar plant
3 kWp rooftop solar array on the RCC roof of a home in R.V. Puram, Kanyakumari
Verified project  ResidentialR.V. Puram, Kanyakumari · RCC roof

Home cuts its grid bill with rooftop solar

3kWp
Capacity
4,500kWh/yr
Generation
~4.10t/yr
CO₂ avoided

Modules Waaree · Inverter Fronius

Site

A 3 kWp home system for the Palavesham residence in R.V. Puram, Kanyakumari.

Kit

Waaree modules on a Fronius inverter, generating about 4,500 units a year.

Result

About 4.10 tonnes of CO₂ avoided each year off the home's grid bill.

Discuss a similar plant
Rooftop solar array on a wide metal-deck industrial roof
Indicative  Frozen foodTamil Nadu · RCC + metal deck

Cold-chain plant offsets round-the-clock refrigeration load

1.2MWp
Capacity
17.5L units/yr
Generation
~4yr
Payback
Challenge

Heavy, near-constant refrigeration load with limited unshaded roof over insulated panels.

Engineering

Non-penetrative ballast mount to protect the insulated deck; layout sized to daytime base load.

Result

A large slice of daytime draw shifted to solar, with monitored performance across the cold chain.

Discuss a similar plant
Rooftop solar on the GI-sheet roof of a textile processing unit
Indicative  Textile processingTiruppur · GI sheet roof

Dyeing unit powers its daytime process load

3.2MWp
Capacity
47L units/yr
Generation
~3.8yr
Payback
Challenge

Large two-shift process load and long sheet-metal spans with real monsoon wind uplift.

Engineering

Wind-load design to IS 875, aerodynamic mounting, and string-level MPPT for a high self-consumption ratio.

Result

Most daytime process energy met on site, cutting exposure to rising HT tariffs.

Discuss a similar plant
Solar canopy structure over an open parking area
Indicative  AutomobileCoimbatore · Steel canopy

EV-ready solar carport for a showroom network

440kWp
Capacity
6.4L units/yr
Generation
~4.5yr
Payback
Challenge

Full roof, but large customer-parking yards sitting idle in the sun.

Engineering

Long-span steel canopies with integrated drainage and EV-charging provision, dual-use land.

Result

Shaded parking plus generation, and a visible sustainability statement for walk-in customers.

Discuss a similar plant
Rooftop solar array detail at an industrial facility
Indicative  PharmaPuducherry · Metal deck

Cleanroom facility reaches sub-4-year payback

1.8MWp
Capacity
26L units/yr
Generation
<4yr
Payback
Challenge

High, steady HVAC and cleanroom load with strict rooftop-access and safety requirements.

Engineering

Tier-1 modules, redundant string protection and remote monitoring aligned to GMP uptime needs.

Result

Stable daytime offset against a high tariff, with a documented performance-ratio benchmark.

Discuss a similar plant
Solar panels across a large industrial warehouse rooftop
Indicative  Cold storageNamakkal · RCC roof

24×7 cold store trims its base load

750kWp
Capacity
11L units/yr
Generation
~4.2yr
Payback
Challenge

Continuous compressor load, so every daytime solar unit is consumed on site.

Engineering

Load-matched sizing with headroom for future expansion, and remote fault alerts.

Result

Near-100% self-consumption, the ideal profile for solar economics.

Discuss a similar plant
Rooftop solar on the RCC roof of an office campus
Indicative  IT campusChennai · RCC + canopy

Office campus cuts daytime grid draw

520kWp
Capacity
7.6L units/yr
Generation
~4.3yr
Payback
Challenge

Weekday, daytime-heavy office load, but weekend export at low feed-in rates to avoid.

Engineering

Sizing tuned to weekday consumption plus a rooftop canopy over the walkways.

Result

A strong weekday offset without over-exporting on weekends.

Discuss a similar plant
Rooftop solar on the RCC roof of a school building
Indicative  EducationKanyakumari · RCC roof

School estate goes largely daytime-solar powered

180kWp
Capacity
2.6L units/yr
Generation
<5yr
Payback
Challenge

Tight budget, daytime-only operation, and a mandate to teach sustainability visibly.

Engineering

Right-sized for school hours with net-metering to bank weekend and holiday surplus.

Result

Meaningful savings that fund other priorities, proof small plants still pay.

Discuss a similar plant
Rooftop solar array on an industrial building
Indicative  Rice & flour millingSouthern TN · Sheet roof

Continuous mill runs on daytime solar

900kWp
Capacity
13.5L units/yr
Generation
~4yr
Payback
Challenge

Dusty environment and vibration-heavy machinery, with soiling a real yield risk.

Engineering

Robust module selection, an easy-access cleaning plan, and PR-benchmarked O&M.

Result

Soiling losses kept in check, protecting the payback over the plant's life.

Discuss a similar plant

07Project register

Built across sectors.

A cross-section of industrial, commercial, institutional and architectural solar delivered since 2013. Capacities are as-built; client names are shown where we have permission.

12 projects

Photographs are representative Goggles Energy installations. Capacity, sector and location are as-built; ask us for the full reference list under NDA.

Your plant deserves its own set of numbers.

Get a solar feasibility assessment