Ground-mount solar plants in Tamil Nadu
When the roof is too small for the load, build on land and wheel the power to your factory.
A ground-mount plant stands on open land, your own or leased, and its power reaches your factory through the TNPDCL grid under Tamil Nadu’s open access rules. Landowners can also host one or lease out their land.
- 1 MW to multi-MW
- Captive and group captive
- Fixed-tilt or tracker
- Design, build, O&M
Three ways to use a ground-mount plant
| Model | Who owns it | Where the power goes | Main charges |
|---|---|---|---|
| Captive | Your company | Wheeled to your HT connection | Wheeling, transmission, banking; no cross-subsidy surcharge |
| Group captive | Several users holding at least 26% together | Users who take at least 51% of the output | Same as captive, within each user’s share |
| Sale to TNPDCL (PM-KUSUM A) | A landowner or farmer group | The grid, under a 25-year agreement | None; paid about ₹3.02–3.09 a unit |
Under the Electricity (Amendment) Rules 2026, the 26% and 51% tests apply to all users together, each capped at its share. Tamil Nadu’s PM-KUSUM allocation is 14 MW, to be commissioned by 31 March 2027, so few new sites qualify.
Land, output and cost
| For each MW (AC) | Figure | Basis |
|---|---|---|
| Land | 3–5 acres | Central benchmark 3 acres; TN KUSUM tenders ask for 3.7 and prefer 4–5 |
| Units a year | about 18.4 lakh | 21% minimum capacity factor, 2026 TNERC power purchase order (1,840 units per kW AC) |
| Cost before land | ₹3.5–4 crore | Central benchmark ₹3.5 crore; TNERC draft normative ₹4 crore |
Smaller site? See the 1-acre plant.
What open access costs in Tamil Nadu
| Charge | Current figure |
|---|---|
| Wheeling (HT) | ₹1.03 a unit in FY 2026-27 |
| Transmission (long-term) | ₹5,803 per MW per day (about ₹1.15 a unit for solar) |
| Banking | 8% of banked energy, settled monthly by time of day; unused energy bought back at 75%. None for third-party sale. |
| Cross-subsidy surcharge | None on captive use within the 26% / 51% rule; third-party HT buyers paid ₹1.92 a unit in FY 2024-25. |
| Additional surcharge | Set every six months: ₹0.10 a unit for April to September 2025; TNPDCL has proposed ₹0.63 for October 2026 to March 2027 |
Transmission per unit is our arithmetic at a 21% capacity factor. TNERC resets these charges from FY 2027-28, so we model your plant on the order in force when you build. Other models: CAPEX vs RESCO vs open access.
Who it suits
- HT factories, mills and IT parks with more daytime load than their roof can carry, alone or sharing one plant as group captive.
- Landowners with 4 acres or more of flat, shade-free land near a substation.
- Colleges, hospitals and campuses with spare land on site.
How we build a ground-mount plant
- We check soil, flooding, shade and distance to the substation, and read your load from 12 months of HT bills.
- We set the ownership structure, run a yield study and file open access and connectivity applications with TNPDCL and the state load despatch centre.
- We build pile or ballast foundations, fixed-tilt or tracker structures to IS 875 wind loads, and the substation line.
- We then monitor remotely, clean, clear vegetation and send monthly generation and banking statements.
FAQ
How much land does a 1 MW solar plant need in Tamil Nadu?
About 3 to 5 acres per MW. Tamil Nadu’s PM-KUSUM tenders ask for at least 3.7 acres within 5 km of a substation.
Can a factory use power from a solar plant on land somewhere else?
Yes. Under TNERC’s Green Energy Open Access Regulations, 2025, a captive or group captive plant can wheel power to your HT connection, paying open access charges instead of the full tariff.
What is group captive solar?
One plant shared by several users who together own at least 26% of it and use at least 51% of its output.
How much does a ground-mount solar plant cost?
About ₹3.5–4 crore per MW before land, and more per MW for small plants.
Is there a subsidy for ground-mount solar in Tamil Nadu?
We found no capital subsidy for a private plant. Companies that own one can claim 40% accelerated depreciation.
Sources: TNERC Green Energy Open Access Regulations, 2025 (Gazette, 4 Feb 2026); TNERC Tariff Order No. 6 of 2024 (wheeling, cross-subsidy surcharge); TNERC P.P.A.P. No. 2 of 2026 (21% CUF); CTUIL benchmark cost and land advisory (Sep 2026); Mercom on TNERC’s PM-KUSUM approval (May 2026); Renewable Watch on KUSUM timelines; Electricity (Amendment) Rules 2026 note; DT Next on the proposed surcharge (Sep 2026). Checked 21 Nov 2026.