The income depends on four published numbers: the land benchmark, a TNERC-approved capacity factor, the PM-KUSUM tariff and a factory’s open access charges.
How much solar fits on 1 acre
A ground-mount plant needs about 3 to 5 acres per MW. The central benchmark is 3 acres; Tamil Nadu’s PM-KUSUM tenders ask for at least 3.7 acres and prefer 4–5, for row spacing, roads and a margin. One acre therefore holds about 200–330 kW (AC), roughly 260–430 kWp of panels.
How many units it makes
- Plant size
- 200–330 kW AC
- Units a year
- 3.7–6.1 lakh
- Units a month
- 31,000–51,000
A 15 MW solar-plus-battery plant TNERC approved in March 2026 must reach at least a 21% capacity factor, about 1,840 units a year per kW AC. With more panels than inverter capacity, that is about 1,400–1,450 units per kW of panels, the figure our bill calculator uses.
What it costs
At utility-scale benchmarks of ₹3.5–4 crore per MW AC (central benchmark ₹3.5 crore; TNERC’s draft normative cost ₹4 crore), one acre costs ₹70 lakh to ₹1.3 crore before land and GST; a plant this small costs more. Survey, approvals and the substation line cost nearly as much for a small plant as a big one. Rooftop prices: solar plant cost in Tamil Nadu.
Income by route
- Value of a unit
- about ₹3.05
- A month
- ₹0.9–1.5 lakh
- Value of a unit
- ≈ ₹5.32
- Made up of
- ₹7.50 less ₹1.03 wheeling and about ₹1.15 transmission
- A month
- ₹1.6–2.7 lakh
- Terms
- A rent per acre per year, agreed with the developer; no standard rate is published
Bars show income a year to scale; the lighter end is the top of the range. The lease route has no published figure.
Before upkeep, banking losses (8% of banked energy) and any additional surcharge. TNERC approved a PM-KUSUM tariff of ₹3.02–3.09 in May 2026, against a ₹3.10 ceiling. The transmission figure is our arithmetic from ₹5,803 per MW per day.
Selling to TNPDCL
Tamil Nadu’s PM-KUSUM Component A plants are 1–2 MW, so one acre is too small on its own: you need about 4–10 acres, or a group of neighbours. The state’s allocation is 14 MW, with commissioning due by 31 March 2027. At about ₹3 a unit, payback takes roughly 6–7 years before upkeep.
Why captive use pays more
A captive unit is still worth about ₹5.30 after wheeling and transmission, so payback is about 4 years or a little more at that benchmark, before upkeep, banking losses and surcharges. Hotels, hospitals and malls replace HT power at ₹9.40 a unit rather than ₹7.50. Captive use within the 26% ownership and 51% consumption rule pays no cross-subsidy surcharge. Options and charges: ground-mount solar in Tamil Nadu. Rooftop alternative: 1 MW rooftop units and savings.
Frequently asked questions
How much solar can 1 acre hold in Tamil Nadu?
About 200–330 kW (AC), or 260–430 kWp of panels; flat, regular, shade-free land sits at the top of that range.
How many units does a 1 acre solar plant make?
About 3.7–6.1 lakh units a year, or 31,000–51,000 a month. A 15 MW solar-plus-battery plant TNERC approved in March 2026 must reach at least a 21% capacity factor, about 1,840 units a year per kW AC; we use that figure.
What is the income per month from a 1 acre solar plant?
About ₹0.9–1.5 lakh a month sold to TNPDCL, or ₹1.6–2.7 lakh a month saved by your own HT factory under captive open access, before upkeep, banking losses and surcharges.
Is there a subsidy for a solar plant on land in Tamil Nadu?
We found no capital subsidy for a private ground-mount plant. Under PM-KUSUM A the owner earns only the tariff; the central incentive goes to TNPDCL. Owners can claim 40% accelerated depreciation.
Can I lease my land for a solar plant in Tamil Nadu?
Yes. Developers and TNGECL lease land for solar, usually for 25–30 years and within about 5 km of a substation; TNGECL asked owners to quote a yearly rent per acre.
Sources: CTUIL benchmark cost and land advisory (Sep 2026); TNERC P.P.A.P. No. 2 of 2026 (21% CUF); Mercom on TNERC’s PM-KUSUM approval (May 2026); Renewable Watch on KUSUM timelines; DT Next on TNGECL land leasing (Jun 2025); TNERC Green Energy Open Access Regulations, 2025 (Gazette, 4 Feb 2026); TNERC Tariff Order No. 6 of 2024 (wheeling, cross-subsidy surcharge). Checked 21 Nov 2026.