C&I solar, explained by the engineers who build it.

Straight answers on cost, payback, feasibility, commercial models and regulations, written for plant heads and CFOs, not for search engines.

10 guidesUpdated for Tamil Nadu & South India C&I

Latest guides

O&M8 min read

Why Solar Plants Underperform: O&M, Soiling & Performance Ratio

Between the nameplate and your meter sits a stack of quiet losses. How soiling, heat and downtime erode generation, and what good O&M and a healthy performance ratio protect.

Read guide
Finance8 min read

Accelerated Depreciation & Tax Benefits on Commercial Solar in India

How the 40% + 20% first-year write-off works, what the concessional 22% tax regime changes, and an illustrative example. General information, not tax advice.

Read guide
BIPV7 min read

BIPV Explained: Turning Facades & Roofs into Power

Building-integrated PV replaces cladding and glazing with generation. Where facade and skylight solar makes sense in South India, the yield trade-offs, and when it pays.

Read guide
Storage8 min read

Solar + Battery Storage for Factories: When It Pays

Batteries rarely pay on energy savings alone. When demand charges, time-of-day tariffs, diesel offset and backup stack up to justify storage for a C&I plant.

Read guide
Economics9 min read

Rooftop Solar for Factories in Tamil Nadu: Cost, Savings, ROI & Payback

What a factory rooftop plant really costs, how the savings stack up against an ₹8–11/unit HT tariff, and why sizing to daytime load decides your payback.

Read guide
Feasibility8 min read

100 kW to 1 MW Rooftop Solar: A Complete Feasibility Checklist

The 12 checks, roof, structure, shading, load profile, sanctioned load, DISCOM, that decide whether your factory or warehouse is solar-ready.

Read guide
Subsidy2 min read

How to Apply on the TNEB Solar Rooftop Portal (2026)

PM Surya Ghar plus tnebltd.gov.in/usrp: steps, documents, timelines and where applications get stuck.

Read guide
Subsidy2 min read

Tamil Nadu's ₹1 Lakh Solar Subsidy: How the ₹22,000 Top-Up Works

₹35,000, ₹70,000 or ₹1 lakh by system size, the 5 August 2026 cut-off, and why to apply early.

Read guide
Institutions2 min read

Solar for Schools and Colleges in Tamil Nadu: What a Campus Actually Saves

A 300 kWp engineering college worked through, holidays, and zero-investment RESCO for trusts.

Read guide
Subsidy6 min read

PM Surya Ghar Subsidy in Tamil Nadu (2026): Amount, Eligibility & How to Apply

₹30,000 to ₹78,000 central subsidy, the new ₹22,000 state top-up, and the TNPDCL application step by step.

Read guide
Cost6 min read

Rooftop Solar Price in Tamil Nadu per kW (2026): Home & Commercial

1 kW to 10 kW home prices with subsidy, and 100 kW to 1 MW commercial plants per watt.

Read guide
Cost7 min read

What a 100 kW, 250 kW, 500 kW or 1 MW Plant Costs in Tamil Nadu

Indicative turnkey price bands by capacity, what moves the number up or down, and how per-watt cost falls as you scale.

Read guide
Commercial models8 min read

CAPEX vs RESCO vs Open Access: Which Solar Model Fits Your Factory?

Own it, pay per unit, or scale beyond the roof. A plain-English comparison of upfront, ownership, payment and who each model suits.

Read guide
Regulatory7 min read

Net Metering for C&I Consumers in Tamil Nadu: Rules & Banking

How net vs gross metering and banking affect your project economics, and why net-billing states reward sizing to self-consumption.

Read guide
Structural6 min read

Wind Load & Roof Safety for Industrial Solar (IS 875)

Dead load plus wind uplift is where cheap proposals cut corners. What a real structural assessment checks before a single panel is ordered.

Read guide

Free site visit + free savings report

Send three details. An engineer reviews your bill and tells you the right system size, your subsidy and payback, free and with no obligation. We usually call or WhatsApp the same working day.

Prefer chat? WhatsApp us or call +91 77081 08158. No spam, no call centre.

Thank you, we have your details.

An engineer will contact you within working hours (Mon–Sat, 9 am – 6 pm). Want a faster reply?

Reading is good. A feasibility assessment is better.

Get a solar feasibility assessment
WhatsApp us Free quote